Building energy audit, Core 4 seriesSample
by Ujjayiniprithvi Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ujjayiniprithvi Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core 4 service of building energy audit by Ujjayiniprithvi covers 6 connected load options (100 kW to 25 MW). Key features: solar and efficiency retrofit options, savings quantified with measured data and power factor and harmonics assessment. Suited to industrial plants, hospitals and hotels and PAT designated consumers. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ujjayiniprithvi
- Model
- UJJ-D75 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWUJJ-D75-01 | Connected load: 100 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load500 kWUJJ-D75-02 | Connected load: 500 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load1 MWUJJ-D75-03 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load5 MWUJJ-D75-04 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load10 MWUJJ-D75-05 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load25 MWUJJ-D75-06 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 100 kW to 25 MW (see variants) |
|---|---|
| Audit level | Walk-throughmade to order: Detailed audit / Investment-grade audit |
| Instruments | Ultrasonic flow meter, lux metermade to order: Power analyser, thermal camera |
| Auditor | Certified Energy Manager |
| Report | Implementation roadmap |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 7 daysmade to order: 3 days / 14 days |
| Coverage | Electricalmade to order: Electrical and thermal / Utilities |
| Statutory | PAT scheme Form-Amade to order: Form-1 and Form-2 filing |
| Deliverable | Report and presentationmade to order: Report and monitoring plan |
| Follow-up | Not includedmade to order: Verification after implementation |