Catalogue / Energy audits

No photo yet

Building energy audit, Plus seriesSample

by Ujjayiniprithvi Energy Markets (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ujjayiniprithvi Energy Markets (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Building energy audit from Ujjayiniprithvi, Plus series: 5 connected load options between 500 kW and 25 MW. Highlights: verification after implementation, solar and efficiency retrofit options and statutory forms and BEE reporting. Suited to industrial plants, commercial buildings and hospitals and hotels. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ujjayiniprithvi
Model
UJJ-D75 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load500 kWUJJ-D75-01Connected load: 500 kW1 site · Audit in 1-2 weeksfor verified buyers
Connected load1 MWUJJ-D75-02Connected load: 1 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load5 MWUJJ-D75-03Connected load: 5 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load10 MWUJJ-D75-04Connected load: 10 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load25 MWUJJ-D75-05Connected load: 25 MW1 site · Report in 2-4 weeksfor verified buyers

Specifications

Connected load500 kW to 25 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsUltrasonic flow meter, lux meter
AuditorBEE accredited energy auditor
ReportImplementation roadmap
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration14 daysmade to order: 3 days / 7 days
CoverageElectrical
StatutoryForm-1 and Form-2 filing
DeliverableReport and presentation
Follow-upVerification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited