Catalogue / Electrical safety audits

No photo yet

Earthing and lightning protection audit, Flex seriesSample

by Urjatek Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Earthing and lightning protection audit from Urjatek, Flex series: 4 installed load options between 5 MVA and 50 MVA. Highlights: fire exit and detection checks, training recommendations for staff and compliance matrix against CEA safety rules. Typically used for manufacturing plants, data centres and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjatek
Model
URJ-5F8 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load5 MVAURJ-5F8-01Installed load: 5 MVA1 site · Audit in 1-2 weekson quote
Installed load10 MVAURJ-5F8-02Installed load: 10 MVA1 site · Audit in 1-2 weekson quote
Installed load25 MVAURJ-5F8-03Installed load: 25 MVA1 site · Report in 7-14 dayson quote
Installed load50 MVAURJ-5F8-04Installed load: 50 MVA1 site · Report in 7-14 dayson quote

Specifications

Installed load5 MVA to 50 MVA (see variants)
ScopeAudit with arc-flash studymade to order: Visual and documentation audit / Audit with measurements
AuditorCEA-licensed engineer
MeasurementsEarth resistance, insulationmade to order: Thermography and power quality
ReportAction plan with timeline
Statutory recordsRegisters, test certificates, licence
Sampling100% of HV equipmentmade to order: Representative LV panels
Follow-upRe-audit after 3 monthsmade to order: Close-out verification
Turnaround3-4 weeksmade to order: 1-2 weeks
PresentationFindings to management
AccreditationGovernment recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited