Catalogue / Electrical safety audits
Earthing and lightning protection audit, Flex seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Earthing and lightning protection audit from Urjatek, Flex series: 4 installed load options between 5 MVA and 50 MVA. Highlights: fire exit and detection checks, training recommendations for staff and compliance matrix against CEA safety rules. Typically used for manufacturing plants, data centres and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-5F8 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load5 MVAURJ-5F8-01 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load10 MVAURJ-5F8-02 | Installed load: 10 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load25 MVAURJ-5F8-03 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load50 MVAURJ-5F8-04 | Installed load: 50 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 5 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash studymade to order: Visual and documentation audit / Audit with measurements |
| Auditor | CEA-licensed engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Action plan with timeline |
| Statutory records | Registers, test certificates, licence |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Re-audit after 3 monthsmade to order: Close-out verification |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Findings to management |
| Accreditation | Government recognised agency |