Catalogue / Substation construction

No photo yet

Pooling substation for renewable projects, Elite 8 seriesSample

by Urjatek Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Elite 8 service of pooling substation for renewable projects by Urjatek covers 3 voltage class options (33 kV to 132 kV). Highlights: control room cabling and glanding, earth grid designed for fault level and soil resistivity and battery and DC system installation. Suited to data centre power infrastructure, renewable pooling stations and industrial captive substations. Delivered in line with CEA (Technical Standards for Construction of Electrical Plants) Regulations, IEC 61936-1 and IS 3043 (Earthing). Mobilisation Engineering in 4-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjatek
Model
URJ-DC2 series
Listing type
Service
Unit
bay
Minimum order
1 bay
Lead time
Engineering in 4-6 weeks
Warranty
Equipment as per OEM
Standards
CEA (Technical Standards for Construction of Electrical Plants) Regulations, IEC 61936-1, IS 3043 (Earthing)
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Voltage class33 kVURJ-DC2-01Voltage class: 33 kV1 bay · Engineering in 4-6 weekson quote
Voltage class66 kVURJ-DC2-02Voltage class: 66 kV1 bay · Engineering in 4-6 weekson quote
Voltage class132 kVURJ-DC2-03Voltage class: 132 kV1 bay · Engineering in 4-6 weekson quote

Specifications

Voltage class33 kV to 132 kV (see variants)
TypeHybrid GIS
ScopeCivil and structuralmade to order: Erection and testing / Full turnkey
TransformersUp to 160 MVA
EarthingCopper-bonded rodsmade to order: GI flat grid with ground rods
Bay count6-10 baysmade to order: 2-4 bays
Protection schemeNumerical busbar protectionmade to order: Main-1 and Main-2 relays
SCADA and communicationIEC 61850 compliantmade to order: IEC 60870-5-104
StatutorySTU charging approvalmade to order: CEIG inspection support
Duration12-15 months
Payment termsPercentage on supply, erection

BARREL: Bharat Atom Renewable Resources Energy Limited