Catalogue / Substation construction
Pooling substation for renewable projects, Elite 8 seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Elite 8 service of pooling substation for renewable projects by Urjatek covers 3 voltage class options (33 kV to 132 kV). Highlights: control room cabling and glanding, earth grid designed for fault level and soil resistivity and battery and DC system installation. Suited to data centre power infrastructure, renewable pooling stations and industrial captive substations. Delivered in line with CEA (Technical Standards for Construction of Electrical Plants) Regulations, IEC 61936-1 and IS 3043 (Earthing). Mobilisation Engineering in 4-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-DC2 series
- Listing type
- Service
- Unit
- bay
- Minimum order
- 1 bay
- Lead time
- Engineering in 4-6 weeks
- Warranty
- Equipment as per OEM
- Standards
- CEA (Technical Standards for Construction of Electrical Plants) Regulations, IEC 61936-1, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage class33 kVURJ-DC2-01 | Voltage class: 33 kV | 1 bay · Engineering in 4-6 weeks | on quote |
| Voltage class66 kVURJ-DC2-02 | Voltage class: 66 kV | 1 bay · Engineering in 4-6 weeks | on quote |
| Voltage class132 kVURJ-DC2-03 | Voltage class: 132 kV | 1 bay · Engineering in 4-6 weeks | on quote |
Specifications
| Voltage class | 33 kV to 132 kV (see variants) |
|---|---|
| Type | Hybrid GIS |
| Scope | Civil and structuralmade to order: Erection and testing / Full turnkey |
| Transformers | Up to 160 MVA |
| Earthing | Copper-bonded rodsmade to order: GI flat grid with ground rods |
| Bay count | 6-10 baysmade to order: 2-4 bays |
| Protection scheme | Numerical busbar protectionmade to order: Main-1 and Main-2 relays |
| SCADA and communication | IEC 61850 compliantmade to order: IEC 60870-5-104 |
| Statutory | STU charging approvalmade to order: CEIG inspection support |
| Duration | 12-15 months |
| Payment terms | Percentage on supply, erection |