Catalogue / Third-party inspection (TPI)
Solar module and inverter inspection, Eco 2 seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Urjatek Eco 2 solar module and inverter inspection, offered in 5 inspection effort options from 5 man-days to 100 man-days. Design: calibration check of test equipment, hold and witness points per QAP and quick mobilisation across India. Typically used for lender quality assurance, government procurement and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-AE8 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysURJ-AE8-01 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort10 man-daysURJ-AE8-02 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort20 man-daysURJ-AE8-03 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort50 man-daysURJ-AE8-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort100 man-daysURJ-AE8-05 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 5 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structures |
| Inspection stage | Raw materialmade to order: In-process / Final pre-dispatch |
| Standards used | Per client specification |
| Inspector qualification | Level II NDT certified |
| Accreditation | Empanelled inspection agencymade to order: ISO/IEC 17020 body |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Pan Indiamade to order: Domestic and export vendors |
| Sampling | As per IS 2500made to order: AQL level II |
| Release note | Hard copy plus scanmade to order: Digital signature |
| Travel | At actuals |