Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Protection relay and secondary injection tests, Edge seriesSample

by Urjatek Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Urjatek Edge protection relay and secondary injection tests, offered in 6 plant size options from 1 MW to 100 MW. Design: thermography prior to energisation, instrument calibration certificates and checklist driven testing. Typically used for renewable parks, EPC handover and industrial substations. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjatek
Model
URJ-621 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
On-site 3-21 days
Warranty
Retest at no cost on instrument error
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size1 MWURJ-621-01Plant size: 1 MW1 site · On-site 3-21 daysfor verified buyers
Plant size5 MWURJ-621-02Plant size: 5 MW1 site · On-site 3-21 daysfor verified buyers
Plant size10 MWURJ-621-03Plant size: 10 MW1 site · On-site 3-21 daysfor verified buyers
Plant size25 MWURJ-621-04Plant size: 25 MW1 site · On-site 3-21 daysfor verified buyers
Plant size50 MWURJ-621-05Plant size: 50 MW1 site · On-site 3-21 daysfor verified buyers
Plant size100 MWURJ-621-06Plant size: 100 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size1 MW to 100 MW (see variants)
ScopeComplete SAT with performance testmade to order: Electrical pre-commissioning / Solar SAT
InstrumentsRelay test set, IV tracer, CRM
Test sequenceVisual, mechanical, electricalmade to order: Per client approved format
TeamTeam of 6 with leadmade to order: Test engineer plus 2 technicians
Duration on site10 daysmade to order: 3-5 days / 3 weeks
ReportsTest results on approved formats
CalibrationCalibration certificates attachedmade to order: NABL traceable
Witnessed byClient engineer
Retest policyOne retest included
PaymentOn completion of reportmade to order: 50% advance

BARREL: Bharat Atom Renewable Resources Energy Limited