Catalogue / Cabling, trenching & HDD works
HT cable jointing and termination, Eco seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco service of HT cable jointing and termination by Urjatek covers 6 cable route length options (1 km to 50 km). Key features: utility locating before excavation, traffic management at crossings and HDD bore log and as-built survey. Used by railway and highway crossings, renewable plant internal networks and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-1C8 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmURJ-1C8-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length2 kmURJ-1C8-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length5 kmURJ-1C8-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length10 kmURJ-1C8-04 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length20 kmURJ-1C8-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length50 kmURJ-1C8-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.2 m |
| Cable type | 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Hipot and sheath test |
| Productivity | 300 m per day open trenchmade to order: 50 m per day HDD |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |