Catalogue / Civil & foundation works
Site roads, drainage and boundary wall, Neo seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Site roads, drainage and boundary wall from Urjatek, Neo series: 5 works volume options between 1 MW equivalent and 50 MW equivalent. Highlights: monsoon-ready drainage planning, daily quantity and progress log and cube and pile test records. Used by wind farms, industrial plants and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-5E6 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentURJ-5E6-01 | Works volume: 1 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume5 MW equivalentURJ-5E6-02 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentURJ-5E6-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentURJ-5E6-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume50 MW equivalentURJ-5E6-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | Raft or isolated footing |
| Concrete grade | M25made to order: M30 / M40 for turbine foundation |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 500D TMTmade to order: Fe 550D |
| Roads and drainage | Murram road, 4 m widemade to order: WBM road with culverts / Not included |
| Boundary | Chain link fence 2.4 mmade to order: Compound wall with barbed wire |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Piling rigs and excavators |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Item rate with retention |