Catalogue / Third-party inspection (TPI)
Solar module and inverter inspection, Eco seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Eco service of solar module and inverter inspection by Urjatek covers 6 inspection effort options (1 man-day to 100 man-days). Design: independent opinion for buyers, photographic evidence of each inspection and hold and witness points per QAP. Suited to government procurement, utilities and PSUs and lender quality assurance. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-AE1 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayURJ-AE1-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysURJ-AE1-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysURJ-AE1-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysURJ-AE1-04 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysURJ-AE1-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort100 man-daysURJ-AE1-06 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Cables and conductors |
| Inspection stage | Raw material |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 body |
| Report | Inspection release note |
| Coverage | Domestic and export vendorsmade to order: Pan India |
| Sampling | AQL level IImade to order: As per IS 2500 |
| Release note | Digital signaturemade to order: Hard copy plus scan |
| Travel | Included in ratemade to order: At actuals |