Catalogue / Engineering & design
Basic and detailed engineering for wind farms, Volt 6 seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Volt 6 service of basic and detailed engineering for wind farms by Urjatek covers 5 plant capacity options (5 MW to 100 MW). Highlights: yield and loss modelling aligned to bankable reports, cable sizing and voltage drop calculations and layout optimisation for land and shading. Typically used for captive and C&I solar owners, IPPs and developers and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-004 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 7 days
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWURJ-004-01 | Plant capacity: 5 MW | 1 job · Mobilisation in 7 days | for verified buyers |
| Plant capacity10 MWURJ-004-02 | Plant capacity: 10 MW | 1 job · Mobilisation in 7 days | for verified buyers |
| Plant capacity25 MWURJ-004-03 | Plant capacity: 25 MW | 1 job · Mobilisation in 7 days | for verified buyers |
| Plant capacity50 MWURJ-004-04 | Plant capacity: 50 MW | 1 job · 6-10 weeks | for verified buyers |
| Plant capacity100 MWURJ-004-05 | Plant capacity: 100 MW | 1 job · 6-10 weeks | for verified buyers |
Specifications
| Plant capacity | 5 MW to 100 MW (see variants) |
|---|---|
| Deliverables | Full IFC drawing set with calculationsmade to order: GA drawings, SLD, BoQ / Design basis report plus drawings |
| Design software | PVsyst, AutoCAD, ETAPmade to order: PVsyst, STAAD, ETAP, Civil 3D |
| Team | Lead engineer plus 3 designers |
| Turnaround | 6-8 weeks |
| Revisions included | 3 roundsmade to order: 2 rounds / Unlimited until approval |
| Authority submission support | CEA/CEIG drawing approvalmade to order: DISCOM/STU drawing approval / None |
| Earthing and LA study | Included |
| Format | PDF, CAD and BIM model |
| Site visit | Desk design only |
| Payment milestones | 30% advance, 40% on drafts, 30% on IFC |