Catalogue / Transmission line erection & stringing

No photo yet

Transmission line tower erection and stringing, Pro 9 seriesSample

by Urjatek Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Pro 9 service of transmission line tower erection and stringing by Urjatek covers 3 voltage level options (220 kV to 765 kV). Highlights: foundation concrete cube testing, tower verticality and bolt tightening records and sag and tension charts for stringing. Used by solar and wind evacuation lines, industrial supply lines and railway traction feed. Delivered in line with IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles) and CEA (Measures relating to Safety) Regulations. Mobilisation Per section schedule; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjatek
Model
URJ-5C9 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Per section schedule
Warranty
Workmanship 12 months
Standards
IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles), CEA (Measures relating to Safety) Regulations
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Voltage level220 kVURJ-5C9-01Voltage level: 220 kV1 km · Per section scheduleon quote
Voltage level400 kVURJ-5C9-02Voltage level: 400 kV1 km · Per section scheduleon quote
Voltage level765 kVURJ-5C9-03Voltage level: 765 kV1 km · Per section scheduleon quote

Specifications

Voltage level220 kV to 765 kV (see variants)
Circuit typeSingle circuit
ConductorAAAC or HTLSmade to order: ACSR Panther / ACSR Moose
ScopeFoundation, erection and stringing
Stringing methodConventional stringing
CrewTwo erection gangs plus foundation teammade to order: Gang of 25 per section
Tower testingType-tested towers
Productivity3 km per weekmade to order: 1-1.5 km per week
Approvals supportPTCC clearance and RoWmade to order: Forest and crossing permission
SafetyLive-line crossing precautionsmade to order: Fall protection and line clearance
InsuranceThird-party liabilitymade to order: CAR and workmen compensation

BARREL: Bharat Atom Renewable Resources Energy Limited