Catalogue / Testing & commissioning
Pre-commissioning tests and energisation, Ultra seriesSample
by Urjatek Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatek Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Urjatek Ultra pre-commissioning tests and energisation, offered in 4 plant capacity options from 1 MW to 25 MW. Highlights: live relay setting verification, punch list tracked to closure and commissioning certificates for lenders. Used by EPC handover to owners, lender completion tests and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Report in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatek
- Model
- URJ-8F9 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Report in 7 days
- Warranty
- Retest at no cost if failure traced to test error
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWURJ-8F9-01 | Plant capacity: 1 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity5 MWURJ-8F9-02 | Plant capacity: 5 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity10 MWURJ-8F9-03 | Plant capacity: 10 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity25 MWURJ-8F9-04 | Plant capacity: 25 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 1 MW to 25 MW (see variants) |
|---|---|
| Tests covered | Full plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests |
| Instruments | Relay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM |
| Calibration | NABL traceable certificates |
| Team | Commissioning engineer plus 2 testers |
| Statutory support | CEIG inspection coordination |
| Reports | Commissioning dossier with as-builtmade to order: Test reports with signed formats |
| Duration on site | 10-14 daysmade to order: 5-7 days / 3-4 weeks |
| Performance guarantee test | Capacity and PR test per contract |
| Grid code checks | Reactive power and ramp ratemade to order: Not included |
| Payment | Milestone on energisationmade to order: 50% on start, 50% on report |