Catalogue / Electrical safety audits
Statutory electrical compliance audit, Plus 2 seriesSample
by Urjatron Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatron Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Urjatron Plus 2 statutory electrical compliance audit, offered in 5 installed load options from 500 kVA to 25 MVA. Highlights: fire exit and detection checks, risk-ranked findings and compliance matrix against CEA safety rules. Typically used for solar and wind sites, data centres and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatron
- Model
- URJ-754 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load500 kVAURJ-754-01 | Installed load: 500 kVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load1 MVAURJ-754-02 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load5 MVAURJ-754-03 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load10 MVAURJ-754-04 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load25 MVAURJ-754-05 | Installed load: 25 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 500 kVA to 25 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash study |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Earth resistance, insulation |
| Report | Action plan with timeline |
| Statutory records | Registers, test certificates, licencemade to order: Permit-to-work audit |
| Sampling | 100% of HV equipment |
| Follow-up | Re-audit after 3 months |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Report onlymade to order: Findings to management |
| Accreditation | ISO/IEC 17020 bodymade to order: Government recognised agency |