Catalogue / Electrical safety audits

No photo yet

Statutory electrical compliance audit, Plus 2 seriesSample

by Urjatron Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjatron Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Urjatron Plus 2 statutory electrical compliance audit, offered in 5 installed load options from 500 kVA to 25 MVA. Highlights: fire exit and detection checks, risk-ranked findings and compliance matrix against CEA safety rules. Typically used for solar and wind sites, data centres and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjatron
Model
URJ-754 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Re-audit at reduced rate
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load500 kVAURJ-754-01Installed load: 500 kVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load1 MVAURJ-754-02Installed load: 1 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load5 MVAURJ-754-03Installed load: 5 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load10 MVAURJ-754-04Installed load: 10 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load25 MVAURJ-754-05Installed load: 25 MVA1 site · Report in 7-14 daysfor verified buyers

Specifications

Installed load500 kVA to 25 MVA (see variants)
ScopeAudit with arc-flash study
AuditorCEA-licensed engineermade to order: Chartered engineer
MeasurementsEarth resistance, insulation
ReportAction plan with timeline
Statutory recordsRegisters, test certificates, licencemade to order: Permit-to-work audit
Sampling100% of HV equipment
Follow-upRe-audit after 3 months
Turnaround3-4 weeksmade to order: 1-2 weeks
PresentationReport onlymade to order: Findings to management
AccreditationISO/IEC 17020 bodymade to order: Government recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited