Catalogue / Site acceptance & pre-commissioning tests
Site acceptance testing for solar plants, Smart seriesSample
by Urjatron Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatron Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Site acceptance testing for solar plants from Urjatron, Smart series: 4 plant size options between 25 MW and 250 MW. Highlights: instrument calibration certificates, defect register shared daily and checklist driven testing. Typically used for EPC handover, industrial substations and renewable parks. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation Mobilisation in 3-7 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatron
- Model
- URJ-249 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Mobilisation in 3-7 days
- Warranty
- Report accuracy guaranteed
- Standards
- IEC 62446-1, IS 3043, IEC 61557
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant size25 MWURJ-249-01 | Plant size: 25 MW | 1 site · Mobilisation in 3-7 days | on quote |
| Plant size50 MWURJ-249-02 | Plant size: 50 MW | 1 site · Mobilisation in 3-7 days | on quote |
| Plant size100 MWURJ-249-03 | Plant size: 100 MW | 1 site · On-site 3-21 days | on quote |
| Plant size250 MWURJ-249-04 | Plant size: 250 MW | 1 site · On-site 3-21 days | on quote |
Specifications
| Plant size | 25 MW to 250 MW (see variants) |
|---|---|
| Scope | Complete SAT with performance testmade to order: Electrical pre-commissioning / Solar SAT |
| Instruments | Relay test set, IV tracer, CRM |
| Test sequence | Visual, mechanical, electrical |
| Team | Test engineer plus 2 technicians |
| Duration on site | 10 days |
| Reports | Digital dossier with photos |
| Calibration | Calibration certificates attached |
| Witnessed by | Client engineer |
| Retest policy | One retest included |
| Payment | On completion of reportmade to order: 50% advance |