Catalogue / Electrical safety audits
Statutory electrical compliance audit, Duo 7 seriesSample
by Urjatron Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Urjatron Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Duo 7 service of statutory electrical compliance audit by Urjatron covers 3 installed load options (1 MVA to 10 MVA). Design: training recommendations for staff, earthing health and soil resistivity and risk-ranked findings. Used by data centres, hospitals and commercial buildings and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjatron
- Model
- URJ-757 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAURJ-757-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load5 MVAURJ-757-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load10 MVAURJ-757-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 10 MVA (see variants) |
|---|---|
| Scope | Audit with measurementsmade to order: Visual and documentation audit / Audit with arc-flash study |
| Auditor | Chartered engineer |
| Measurements | Thermography and power quality |
| Report | Action plan with timelinemade to order: Findings with risk rating |
| Statutory records | Registers, test certificates, licencemade to order: Permit-to-work audit |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Re-audit after 3 months |
| Turnaround | 1-2 weeks |
| Presentation | Findings to management |
| Accreditation | ISO/IEC 17020 body |