Catalogue / Electrical safety audits

No photo yet

Statutory electrical compliance audit, Duo 7 seriesSample

by Urjatron Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjatron Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Duo 7 service of statutory electrical compliance audit by Urjatron covers 3 installed load options (1 MVA to 10 MVA). Design: training recommendations for staff, earthing health and soil resistivity and risk-ranked findings. Used by data centres, hospitals and commercial buildings and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjatron
Model
URJ-757 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 7-14 days
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load1 MVAURJ-757-01Installed load: 1 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load5 MVAURJ-757-02Installed load: 5 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load10 MVAURJ-757-03Installed load: 10 MVA1 site · Report in 7-14 daysfor verified buyers

Specifications

Installed load1 MVA to 10 MVA (see variants)
ScopeAudit with measurementsmade to order: Visual and documentation audit / Audit with arc-flash study
AuditorChartered engineer
MeasurementsThermography and power quality
ReportAction plan with timelinemade to order: Findings with risk rating
Statutory recordsRegisters, test certificates, licencemade to order: Permit-to-work audit
Sampling100% of HV equipmentmade to order: Representative LV panels
Follow-upRe-audit after 3 months
Turnaround1-2 weeks
PresentationFindings to management
AccreditationISO/IEC 17020 body

BARREL: Bharat Atom Renewable Resources Energy Limited