Catalogue / Third-party inspection (TPI)

No photo yet

Third-party inspection of electrical equipment at vendor works, Smart 2 seriesSample

by Urjatron Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjatron Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Third-party inspection of electrical equipment at vendor works from Urjatron, Smart 2 series: 6 inspection effort options between 1 man-day and 100 man-days. Key features: calibration check of test equipment, non-conformity reports with closure tracking and quick mobilisation across India. Typically used for EPC contractors and developers, utilities and PSUs and lender quality assurance. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjatron
Model
URJ-6E5 series
Listing type
Service
Unit
day
Minimum order
1 day
Lead time
Inspector assigned in 48 hours
Warranty
As per contract
Standards
ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Inspection effort1 man-dayURJ-6E5-01Inspection effort: 1 man-day1 day · Inspector assigned in 48 hourson quote
Inspection effort5 man-daysURJ-6E5-02Inspection effort: 5 man-days1 day · Inspector assigned in 48 hourson quote
Inspection effort10 man-daysURJ-6E5-03Inspection effort: 10 man-days1 day · Inspector assigned in 48 hourson quote
Inspection effort20 man-daysURJ-6E5-04Inspection effort: 20 man-days1 day · Inspector assigned in 48 hourson quote
Inspection effort50 man-daysURJ-6E5-05Inspection effort: 50 man-days1 day · Report in 24-48 hourson quote
Inspection effort100 man-daysURJ-6E5-06Inspection effort: 100 man-days1 day · Report in 24-48 hourson quote

Specifications

Inspection effort1 man-day to 100 man-days (see variants)
Equipment inspectedTransformers and reactors
Inspection stageIn-process
Standards usedPer approved QAP
Inspector qualificationLevel II NDT certifiedmade to order: B.E. Electrical with 8 years experience
AccreditationEmpanelled inspection agencymade to order: ISO/IEC 17020 body
ReportDetailed report with photos in 48 hoursmade to order: Inspection release note
CoverageDomestic and export vendorsmade to order: Pan India
SamplingAQL level II
Release noteHard copy plus scanmade to order: Digital signature
TravelAt actualsmade to order: Included in rate

BARREL: Bharat Atom Renewable Resources Energy Limited