Catalogue / Reciprocating gas & dual-fuel engines
Reciprocating gas engine generator set, Smart seriesSample
by Vaigaispark Gas Turbines (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vaigaispark Gas Turbines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Smart range of reciprocating gas engine generator set by Vaigaispark covers 6 electrical output options (500 kW to 12 MW). Key features: heat recovery for CHP, remote monitoring and diagnostics and CPCB IV+ emission compliance. Used by biogas projects, peak power for industry and hospitals and malls. Designed and tested to ISO 8528, ISO 3046 and CPCB CPCB-IV+. Lead time 30-40 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vaigaispark
- Model
- VAI-019 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 30-40 weeks
- Warranty
- 12 months
- Standards
- ISO 8528, ISO 3046, CPCB CPCB-IV+
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Electrical output500 kWVAI-019-01 | Electrical output: 500 kW | 2 nos · 30-40 weeks | on quote |
| Electrical output1 MWVAI-019-02 | Electrical output: 1 MW | 2 nos · 30-40 weeks | on quote |
| Electrical output2 MWVAI-019-03 | Electrical output: 2 MW | 2 nos · 30-40 weeks | on quote |
| Electrical output4.5 MWVAI-019-04 | Electrical output: 4.5 MW | 2 nos · 30-40 weeks | on quote |
| Electrical output9 MWVAI-019-05 | Electrical output: 9 MW | 2 nos · 30-40 weeks | on quote |
| Electrical output12 MWVAI-019-06 | Electrical output: 12 MW | 2 nos · 30-40 weeks | on quote |
Specifications
| Electrical output | 500 kW to 12 MW (see variants) |
|---|---|
| Fuel | HSD / gas dual fuelmade to order: Natural gas / Biogas / CBG |
| Engine speed | 1000 rpm |
| Electrical efficiency | 47% |
| Cylinders | V12 |
| Combustion | Lean-burn spark ignited |
| Cooling | Water-water |
| Generator voltage | 6.6 kVmade to order: 415 V / 3.3 kV / 11 kV |
| Emission | NOx < 250 mg/Nm3 |
| Starting | Electric |
| Enclosure | Containermade to order: Open skid |
| Heat recovery | Steam |