Turbine condition monitoring, Flex seriesSample
by Vidarbha Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidarbha Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Flex service of turbine condition monitoring by Vidarbha covers 6 fleet size options (5 turbines to 150 turbines). Highlights: oil analysis and trend reports, energy loss and curtailment analysis and blade leading-edge repair. Typically used for aggregators of old fleets, repowering and life extension and wind farm owners post warranty. Delivered in line with IEC 61400-1, IEC 61400-25 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation of crew 2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidarbha
- Model
- VID-264 series
- Listing type
- Service
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- Mobilisation of crew 2 weeks
- Warranty
- Availability guarantee with LD
- Standards
- IEC 61400-1, IEC 61400-25, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Fleet size5 turbinesVID-264-01 | Fleet size: 5 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size10 turbinesVID-264-02 | Fleet size: 10 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size20 turbinesVID-264-03 | Fleet size: 20 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size40 turbinesVID-264-04 | Fleet size: 40 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size80 turbinesVID-264-05 | Fleet size: 80 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size150 turbinesVID-264-06 | Fleet size: 150 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
Specifications
| Fleet size | 5 turbines to 150 turbines (see variants) |
|---|---|
| Scope | Comprehensive including sparesmade to order: Scheduled maintenance only / Availability based O&M |
| Turbine class | Up to 1.5 MW |
| Availability guarantee | 95% machine availability |
| Technician team | Local crew plus rope-access team |
| Blade inspection | Semi-annual with repairsmade to order: Annual drone and rope inspection |
| Gearbox oil | Annual samplingmade to order: Quarterly sampling and filtration |
| Major components | Excludedmade to order: Included with cap |
| Monitoring | Vibration based CMSmade to order: 24x7 remote SCADA |
| Response | 24 hours |
| Term | 1 yearmade to order: 3 years / 5 years |