Catalogue / Solar plant O&M & module cleaning
Preventive and corrective maintenance for solar parks, Elite seriesSample
by Vidarbha Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidarbha Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Preventive and corrective maintenance for solar parks from Vidarbha, Elite series: 4 plant capacity options between 1 MWp and 25 MWp. Highlights: inventory and spares ledger, soiling loss tracking and compliance with grid code scheduling. Typically used for lender-monitored assets, c&I rooftop owners and IPP solar parks. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Takeover in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidarbha
- Model
- VID-D92 series
- Listing type
- Service
- Unit
- MWp
- Minimum order
- 1 MWp
- Lead time
- Takeover in 2-3 weeks
- Warranty
- Availability guarantee with penalty
- Standards
- IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWpVID-D92-01 | Plant capacity: 1 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity5 MWpVID-D92-02 | Plant capacity: 5 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity10 MWpVID-D92-03 | Plant capacity: 10 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity25 MWpVID-D92-04 | Plant capacity: 25 MWp | 1 MWp · Baseline audit before takeover | on quote |
Specifications
| Plant capacity | 1 MWp to 25 MWp (see variants) |
|---|---|
| Scope | Full O&M with spare managementmade to order: Cleaning and routine checks / O&M plus asset management |
| Cleaning method | Semi-automatic wetmade to order: Waterless dry brush / Robotic |
| Cleaning frequency | Fortnightlymade to order: Weekly / Monthly in monsoon |
| Availability guarantee | Plant availability 99%made to order: Grid availability 99.5% |
| Manpower | Plant manager plus 15 staff for 100 MWmade to order: 1 engineer plus 4 technicians per 10 MW |
| Spares | Consumables includedmade to order: Client supplies |
| Monitoring | 24x7 remote SCADA |
| Response time | 4 hours for critical faultsmade to order: 24 hours |
| Reporting | Monthly generation reportmade to order: Dashboard access for lenders |
| Contract term | 5 yearsmade to order: 1 year / 3 years |