Catalogue / Power system studies (load flow, short circuit, grid code)
Protection coordination and relay setting, Neo 9 seriesSample
by Vidyuttron Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyuttron Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo 9 service of protection coordination and relay setting by Vidyuttron covers 4 network scale options (11 kV plant to 132 kV system). Design: relay setting files ready to load, models acceptable to STU and CTUIL and fault level verification of switchgear. Typically used for utilities and consultants, renewable developers seeking connectivity and BESS integrators. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyuttron
- Model
- VID-F14 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantVID-F14-01 | Network scale: 11 kV plant | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale33 kV plantVID-F14-02 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale66 kV systemVID-F14-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale132 kV systemVID-F14-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | for verified buyers |
Specifications
| Network scale | 11 kV plant to 132 kV system (see variants) |
|---|---|
| Study type | Dynamic and transient |
| Software | ETAP |
| Model data | Utility network model |
| Deliverables | Study report with resultsmade to order: Model files and relay settings |
| Grid code checks | LVRT/HVRT and ramp rate |
| Review | Utility submission supportmade to order: Lender review |
| Scenarios | Multiple dispatch casesmade to order: Normal and N-1 |
| Team | Power system engineer |
| Turnaround | 2-3 weeksmade to order: 4-6 weeks |
| Validation | Compared with measured data |