Catalogue / Resource assessment (solar, wind, hydro)
Solar resource assessment with ground measurement, Core seriesSample
by Vidyuttron Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyuttron Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core service of solar resource assessment with ground measurement by Vidyuttron covers 3 measurement duration options (6 months to 18 months). Highlights: extreme wind and wake studies, data quality control and filling and loss factors for local conditions. Used by wind and solar developers, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyuttron
- Model
- VID-0E6 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration6 monthsVID-0E6-01 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration12 monthsVID-0E6-02 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration18 monthsVID-0E6-03 | Measurement duration: 18 months | 1 report · Desktop in 2-3 weeks | on quote |
Specifications
| Measurement duration | 6 months to 18 months (see variants) |
|---|---|
| Technology | Small hydromade to order: Solar GHI/DNI / Wind |
| Data source | On-site measurement |
| Equipment | Class A pyranometer station |
| Uncertainty | P50/P90 with uncertainty budgetmade to order: Bankable assessment |
| Modelling | PVsyst, SAM |
| Deliverable | Hourly time series datasetmade to order: Resource report |
| Calibration | Calibration pre and post campaign |
| Site count | Single sitemade to order: Multi-site comparison |
| Maintenance | Remote health checks |
| Turnaround | Report in 3 weeks |