Catalogue / Power system studies (load flow, short circuit, grid code)
Protection coordination and relay setting, Eco 5 seriesSample
by Vidyuttron Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyuttron Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco 5 service of protection coordination and relay setting by Vidyuttron covers 5 network scale options (11 kV plant to 220 kV system). Key features: models acceptable to STU and CTUIL, fault level verification of switchgear and reports for GNA/connectivity application. Typically used for utilities and consultants, BESS integrators and industrial plants adding generation. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyuttron
- Model
- VID-F11 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantVID-F11-01 | Network scale: 11 kV plant | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale33 kV plantVID-F11-02 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale66 kV systemVID-F11-03 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale132 kV systemVID-F11-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale220 kV systemVID-F11-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | for verified buyers |
Specifications
| Network scale | 11 kV plant to 220 kV system (see variants) |
|---|---|
| Study type | Harmonics |
| Software | PSS/Emade to order: ETAP / DIgSILENT PowerFactory |
| Model data | Client single line diagram and data |
| Deliverables | Model files and relay settings |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender review |
| Scenarios | Normal and N-1 |
| Team | Lead plus modelling specialistmade to order: Power system engineer |
| Turnaround | 2-3 weeks |
| Validation | Compared with measured datamade to order: Peer review |