Catalogue / Solar module recycling
Glass, aluminium and silicon recovery, Max seriesSample
by Vindhya Associates (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhya Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Vindhya Max glass, aluminium and silicon recovery, offered in 3 quantity options from 50 tonnes to 500 tonnes. Design: authorised recycling facility, certificate of recycling for compliance and high material recovery rate. Typically used for rooftop owners, module manufacturers and EPC contractors. Delivered in line with E-Waste (Management) Rules 2022, CPCB Guidelines and Hazardous Waste Rules 2016. Mobilisation Processing 2-8 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhya
- Model
- VIN-F14 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Processing 2-8 weeks
- Warranty
- As per authorisation
- Standards
- E-Waste (Management) Rules 2022, CPCB Guidelines, Hazardous Waste Rules 2016
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity50 tonnesVIN-F14-01 | Quantity: 50 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity100 tonnesVIN-F14-02 | Quantity: 100 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity500 tonnesVIN-F14-03 | Quantity: 500 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
Specifications
| Quantity | 50 tonnes to 500 tonnes (see variants) |
|---|---|
| Process | Mechanical separation |
| Recovery rate | 90%+ |
| Materials recovered | Glass, aluminium frame, coppermade to order: Silicon, silver |
| Authorisation | Registered recycler |
| Collection | Client delivers |
| Certificate | EPR certificatemade to order: Recycling certificate |
| Data | Traceability records |
| Turnaround | 1-2 months |
| Hazard handling | Broken-glass safe handlingmade to order: Lead and cadmium controls |
| Pricing basis | Net of recovered valuemade to order: Per tonne |