Catalogue / Rack PDUs & busway
Intelligent switched PDU, Prime 4 seriesSample
by Vindhya Critical Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhya Critical Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Vindhya Prime 4 intelligent switched PDU, offered in 3 current options from 63 A to 250 A. Key features: locking IEC C13/C19 outlets prevent accidental unplugging, environmental sensor ports for rack monitoring and busway allows adding tap-offs on live system. Typically used for server rooms, colocation halls and data centre racks. Designed and tested to IEC 62368-1, IEC 60320 and IEC 61439-6. Lead time 2-3 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhya
- Model
- VIN-9E8 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 2-3 weeks
- Warranty
- 12 months from supply
- Standards
- IEC 62368-1, IEC 60320, IEC 61439-6
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Current63 AVIN-9E8-01 | Current: 63 A | 10 nos · 2-3 weeks | for verified buyers |
| Current125 AVIN-9E8-02 | Current: 125 A | 10 nos · 2-3 weeks | for verified buyers |
| Current250 AVIN-9E8-03 | Current: 250 A | 10 nos · 2-3 weeks | for verified buyers |
Specifications
| Current | 63 A to 250 A (see variants) |
|---|---|
| Type | Meteredmade to order: Basic / Monitored by outlet / Switched |
| Phase | 1-phasemade to order: 3-phase |
| Outlets | 20 x C13 + 4 x C19made to order: 12 x C13 / 24 x C13 / 42 x C13 |
| Voltage | 415 Vmade to order: 230 V / 400 V |
| Mounting | Overhead |
| Input plug | Hard-wired |
| Metering accuracy | 0.5% |
| Network | Ethernetmade to order: SNMP / Modbus |
| Busway rating | Up to 800 A |
| Sensors | Temperaturemade to order: Humidity |
| Breakers | Per-outlet MCB |
| Cord length | 3 m |