Catalogue / Electric & electrode boilers
High-voltage electrode boiler, Duo 8 seriesSample
by Vindhya Heat Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhya Heat Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
High-voltage electrode boiler from Vindhya, Duo 8 series: 3 capacity options between 500 kW and 2.5 MW. Design: compact skid with no chimney, IBR-approved pressure part and zero local emissions. Suited to pharma steam, paper and board and food processing. Designed and tested to IBR 1950, IS 2825 and IEC 60519-1. Lead time 8-12 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhya
- Model
- VIN-506 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 8-12 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, IS 2825, IEC 60519-1
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity500 kWVIN-506-01 | Capacity: 500 kW | 10 nos · 8-12 weeks | for verified buyers |
| Capacity1 MWVIN-506-02 | Capacity: 1 MW | 10 nos · 8-12 weeks | for verified buyers |
| Capacity2.5 MWVIN-506-03 | Capacity: 2.5 MW | 10 nos · 8-12 weeks | for verified buyers |
Specifications
| Capacity | 500 kW to 2.5 MW (see variants) |
|---|---|
| Type | Thermic fluidmade to order: Resistance / Electrode |
| Steam output | 1.4 TPH |
| Working pressure | 3.5 bar |
| Supply voltage | 11 kV |
| Efficiency | 98-99.5% |
| Turndown | 10-100% |
| Start-up time | < 20 min cold |
| Control | PLC with SCADA |
| Water quality | Feedwater TDS < 100 ppm |
| Pressure vessel | IBR approved |
| Boiler house | Packaged skid |