Catalogue / Civil & foundation works

No photo yet

Control room and substation building construction, Elite 6 seriesSample

by Vindhya Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Vindhya Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Vindhya Elite 6 control room and substation building construction, offered in 6 works volume options from 1 MW equivalent to 100 MW equivalent. Design: pile layout tolerance maintained to design, local labour employed where possible and waterproofing for cable trenches. Typically used for solar parks, wind farms and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Vindhya
Model
VIN-3B3 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentVIN-3B3-01Works volume: 1 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume5 MW equivalentVIN-3B3-02Works volume: 5 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume10 MW equivalentVIN-3B3-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume25 MW equivalentVIN-3B3-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume50 MW equivalentVIN-3B3-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume100 MW equivalentVIN-3B3-06Works volume: 100 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume1 MW equivalent to 100 MW equivalent (see variants)
Foundation typeDriven steel pilemade to order: Ramming or screw pile / RCC bored pile / Raft or isolated footing
Concrete gradeM30
Pull-out testingRandom test plus lateral load
ReinforcementFe 550D
Roads and drainageNot includedmade to order: Murram road, 4 m wide / WBM road with culverts
BoundaryCompound wall with barbed wire
QualityCube test reports per pourmade to order: NABL lab testing of materials
MachineryBatching plant at sitemade to order: Piling rigs and excavators
Duration4-8 weeks
Payment termsItem rate with retentionmade to order: Measured running bills

BARREL: Bharat Atom Renewable Resources Energy Limited