Catalogue / Engineering & design
Substation and evacuation system design, Volt seriesSample
by Vindhya Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhya Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Substation and evacuation system design from Vindhya, Volt series: 3 plant capacity options between 5 MW and 25 MW. Key features: protection and relay coordination philosophy, yield and loss modelling aligned to bankable reports and cable sizing and voltage drop calculations. Typically used for captive and C&I solar owners, EPC contractors bidding for projects and IPPs and developers. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhya
- Model
- VIN-A26 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-4 weeks
- Warranty
- Design correction at no cost for 12 months
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWVIN-A26-01 | Plant capacity: 5 MW | 1 job · 3-4 weeks | on quote |
| Plant capacity10 MWVIN-A26-02 | Plant capacity: 10 MW | 1 job · 3-4 weeks | on quote |
| Plant capacity25 MWVIN-A26-03 | Plant capacity: 25 MW | 1 job · 3-4 weeks | on quote |
Specifications
| Plant capacity | 5 MW to 25 MW (see variants) |
|---|---|
| Deliverables | Design basis report plus drawings |
| Design software | PVsyst, AutoCAD, ETAP |
| Team | Lead engineer plus 3 designersmade to order: Electrical, civil and SCADA discipline leads |
| Turnaround | 10-12 weeksmade to order: 3-4 weeks / 6-8 weeks |
| Revisions included | 3 roundsmade to order: 2 rounds / Unlimited until approval |
| Authority submission support | Nonemade to order: CEA/CEIG drawing approval / DISCOM/STU drawing approval |
| Earthing and LA study | Optional add-on |
| Format | PDF and native CADmade to order: PDF, CAD and BIM model |
| Site visit | One visit included |
| Payment milestones | 30% advance, 40% on drafts, 30% on IFC |