Catalogue / Grid connectivity & GNA applications
LTA-to-GNA transition advisory, Xtra seriesSample
by Vindhya Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhya Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
LTA-to-GNA transition advisory from Vindhya, Xtra series: 5 capacity applied options between 10 MW and 500 MW. Design: eligibility check before filing, support for relinquishment and transfer and preparation of mandatory technical details. Typically used for storage developers, industrial captive generators and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhya
- Model
- VIN-0B3 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWVIN-0B3-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied50 MWVIN-0B3-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied100 MWVIN-0B3-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied250 MWVIN-0B3-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWVIN-0B3-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 500 MW (see variants) |
|---|---|
| Application | GNA |
| Scope | Document preparation and filing |
| Bank guarantee | Arranged through partner bankmade to order: Arranged by client |
| Studies | Detailed power system studymade to order: Grid impact summary |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Regulatory lead and engineer |
| Timeline | Approval 3-6 months |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Responded within 2 daysmade to order: Until grant |
| Fee basis | Fixed plus successmade to order: Fixed |