Catalogue / Solar & wind BoP construction
Wind farm BoP and internal electrical works, Eco seriesSample
by Vindhya Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhya Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Vindhya Eco wind farm BoP and internal electrical works, offered in 4 project size options from 10 MW to 100 MW. Design: material reconciliation weekly, cable tray and glanding workmanship and earth pit resistance records. Used by IPPs managing multiple packages, EPC contractors subcontracting BoP and wind-solar hybrid parks. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhya
- Model
- VIN-8C5 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 14 days
- Warranty
- Defect liability 24 months
- Standards
- IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size10 MWVIN-8C5-01 | Project size: 10 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size25 MWVIN-8C5-02 | Project size: 25 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size50 MWVIN-8C5-03 | Project size: 50 MW | 1 MW · 3-9 months execution | on quote |
| Project size100 MWVIN-8C5-04 | Project size: 100 MW | 1 MW · 3-9 months execution | on quote |
Specifications
| Project size | 10 MW to 100 MW (see variants) |
|---|---|
| Scope | Cabling and earthingmade to order: Civil plus electrical BoP / Complete BoP except modules |
| DC cables | 6 sq mm solar cablemade to order: 4 sq mm solar cable |
| MV cables | 33 kV XLPE Cumade to order: 33 kV XLPE Al armoured |
| Inverter station | Brick built room |
| Lightning protection | Franklin rod with mastmade to order: ESE system |
| Crew size | 80 persons |
| Equipment | Trenchers, cranes, excavators |
| Quality | QAP with stage inspection |
| Duration | 6-9 monthsmade to order: 3-5 months |
| Payment | Milestone basedmade to order: Monthly measured bills |