Catalogue / Static transfer switches
Static transfer switch (STS), Ultra 6 seriesSample
by Vindhyaneel Data Centre Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhyaneel Data Centre Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Vindhyaneel Ultra 6 static transfer switch (STS), offered in 5 rating options from 63 A to 800 A. Key features: thyristor-based switching under 6 ms, preferred source selection with auto retransfer and phase-angle synchronism check before transfer. Suited to telecom exchanges, hospital critical loads and dual UPS bus architecture. Designed and tested to IEC 62310-3, IEC 62310-1 and IEC 62310-2. Lead time 3-4 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhyaneel
- Model
- VIN-DF5 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 3-4 weeks
- Warranty
- 24 months from supply
- Standards
- IEC 62310-3, IEC 62310-1, IEC 62310-2
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR site, freight included
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating63 AVIN-DF5-01 | Rating: 63 A | 10 nos · 3-4 weeks | for verified buyers |
| Rating125 AVIN-DF5-02 | Rating: 125 A | 10 nos · 3-4 weeks | for verified buyers |
| Rating250 AVIN-DF5-03 | Rating: 250 A | 10 nos · 3-4 weeks | for verified buyers |
| Rating400 AVIN-DF5-04 | Rating: 400 A | 10 nos · 6-8 weeks | for verified buyers |
| Rating800 AVIN-DF5-05 | Rating: 800 A | 10 nos · 6-8 weeks | for verified buyers |
Specifications
| Rating | 63 A to 800 A (see variants) |
|---|---|
| Phase | 3-phase 4-wire |
| Rated voltage | 400 V ACmade to order: 230 V AC / 415 V AC |
| Transfer time | Below 4 msmade to order: Below 6 ms |
| Transfer type | Make-before-break |
| Switching device | SCR thyristors |
| Source priority | Preferred source selectable |
| Maintenance bypass | Manual make-before-break |
| Overload | 125% 10 min |
| Efficiency | Above 99% |
| Display | LCDmade to order: Touchscreen |
| Communication | Dry contactsmade to order: SNMP / Modbus RTU |
| Mounting | 1U/2U rack |