Catalogue / Installation & erection
Power transformer installation and oil filling, Pro 9 seriesSample
by Vindhyatarang Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhyatarang Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Pro 9 service of power transformer installation and oil filling by Vindhyatarang covers 5 installation scope options (10 MW to 200 MW). Key features: material reconciliation reports, mobile team available for remote sites and module handling to avoid micro-cracks. Typically used for c&I rooftop and ground mount, wind farm substations and utility solar parks. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Start after material at site; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhyatarang
- Model
- VIN-715 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Start after material at site
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope10 MWVIN-715-01 | Installation scope: 10 MW | 1 MW · Start after material at site | on quote |
| Installation scope25 MWVIN-715-02 | Installation scope: 25 MW | 1 MW · Start after material at site | on quote |
| Installation scope50 MWVIN-715-03 | Installation scope: 50 MW | 1 MW · Start after material at site | on quote |
| Installation scope100 MWVIN-715-04 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
| Installation scope200 MWVIN-715-05 | Installation scope: 200 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 10 MW to 200 MW (see variants) |
|---|---|
| Scope | Complete mechanical and electrical erection |
| Manpower deployed | 25 technicians per MW-blockmade to order: 60 technicians plus supervisors / Peak crew of 200 |
| Supervision | Project manager, engineers, QA/QCmade to order: Site engineer and safety officer |
| Equipment | Own cranes and erection toolsmade to order: Pile driver, crane, telehandler |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Lost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits |
| Licence | Electrical contractor licence |
| Insurance | CAR, WC and third-party liability |
| Reporting | Daily progress reportmade to order: Weekly report with look-ahead plan |
| Payment terms | Milestone based with 10% retention |