Catalogue / Cabling, trenching & HDD works
Underground cable route survey, Pro seriesSample
by Vindhyatarang Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vindhyatarang Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Vindhyatarang Pro underground cable route survey, offered in 5 cable route length options from 1 km to 20 km. Design: utility locating before excavation, HDD bore log and as-built survey and traffic management at crossings. Suited to renewable plant internal networks, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vindhyatarang
- Model
- VIN-3B7 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmVIN-3B7-01 | Cable route length: 1 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length2 kmVIN-3B7-02 | Cable route length: 2 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length5 kmVIN-3B7-03 | Cable route length: 5 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length10 kmVIN-3B7-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length20 kmVIN-3B7-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 20 km (see variants) |
|---|---|
| Method | Open trench |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.5 m |
| Cable type | LT armoured |
| Jointing | Premouldedmade to order: Heat shrink / Cold shrink |
| Restoration | Road and footpath restoration |
| Permissions | Client arrangesmade to order: Contractor arranges road cut approvals |
| Testing | Hipot and sheath test |
| Productivity | 300 m per day open trench |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |