Catalogue / Cabling, trenching & HDD works
Underground cable route survey, Duo seriesSample
by Wayanad Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Wayanad Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Wayanad Duo underground cable route survey, offered in 5 cable route length options from 1 km to 20 km. Design: drum handling and pulling tension control, traffic management at crossings and HDD bore log and as-built survey. Used by railway and highway crossings, industrial plant cabling and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Wayanad
- Model
- WAY-3B9 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmWAY-3B9-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length2 kmWAY-3B9-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length5 kmWAY-3B9-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length10 kmWAY-3B9-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length20 kmWAY-3B9-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 20 km (see variants) |
|---|---|
| Method | Trenchless HDDmade to order: Open trench / Trench plus HDD for crossings |
| HDD capacity | Up to 450 mm boremade to order: Up to 250 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | LT armoured |
| Jointing | Premouldedmade to order: Heat shrink / Cold shrink |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Client arrangesmade to order: Contractor arranges road cut approvals |
| Testing | Hipot and sheath testmade to order: Insulation and VLF test |
| Productivity | 300 m per day open trenchmade to order: 50 m per day HDD |
| Crew | Trenching team of 15 |