Catalogue / Engineering & design
Basic and detailed engineering for wind farms, Neo 9 seriesSample
by Wayanad Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Wayanad Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo 9 service of basic and detailed engineering for wind farms by Wayanad covers 4 plant capacity options (1 MW to 25 MW). Highlights: yield and loss modelling aligned to bankable reports, protection and relay coordination philosophy and layout optimisation for land and shading. Used by EPC contractors bidding for projects, IPPs and developers and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 6-10 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Wayanad
- Model
- WAY-005 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 6-10 weeks
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWWAY-005-01 | Plant capacity: 1 MW | 1 job · 6-10 weeks | for verified buyers |
| Plant capacity5 MWWAY-005-02 | Plant capacity: 5 MW | 1 job · 6-10 weeks | for verified buyers |
| Plant capacity10 MWWAY-005-03 | Plant capacity: 10 MW | 1 job · 6-10 weeks | for verified buyers |
| Plant capacity25 MWWAY-005-04 | Plant capacity: 25 MW | 1 job · 6-10 weeks | for verified buyers |
Specifications
| Plant capacity | 1 MW to 25 MW (see variants) |
|---|---|
| Deliverables | Design basis report plus drawingsmade to order: GA drawings, SLD, BoQ / Full IFC drawing set with calculations |
| Design software | PVsyst, AutoCAD, ETAP |
| Team | Lead engineer plus 3 designers |
| Turnaround | 6-8 weeksmade to order: 3-4 weeks / 10-12 weeks |
| Revisions included | Unlimited until approvalmade to order: 2 rounds / 3 rounds |
| Authority submission support | Nonemade to order: CEA/CEIG drawing approval / DISCOM/STU drawing approval |
| Earthing and LA study | Included |
| Format | PDF, CAD and BIM model |
| Site visit | Desk design only |
| Payment milestones | 50% advance, 50% on deliverymade to order: 30% advance, 40% on drafts, 30% on IFC |