Catalogue / Grid connectivity & GNA applications

No photo yet

Evacuation approval for solar and wind parks, Edge seriesSample

by Wayanad Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Wayanad Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Edge service of evacuation approval for solar and wind parks by Wayanad covers 6 capacity applied options (10 MW to 1000 MW). Design: eligibility check before filing, preparation of mandatory technical details and bank guarantee timeline tracking. Suited to renewable developers, storage developers and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Wayanad
Model
WAY-F34 series
Listing type
Service
Unit
application
Minimum order
1 application
Lead time
Grant 3-9 months
Warranty
As per contract
Standards
CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Capacity applied10 MWWAY-F34-01Capacity applied: 10 MW1 application · Grant 3-9 monthsfor verified buyers
Capacity applied50 MWWAY-F34-02Capacity applied: 50 MW1 application · Grant 3-9 monthsfor verified buyers
Capacity applied100 MWWAY-F34-03Capacity applied: 100 MW1 application · Grant 3-9 monthsfor verified buyers
Capacity applied250 MWWAY-F34-04Capacity applied: 250 MW1 application · Grant 3-9 monthsfor verified buyers
Capacity applied500 MWWAY-F34-05Capacity applied: 500 MW1 application · Grant 3-9 monthsfor verified buyers
Capacity applied1000 MWWAY-F34-06Capacity applied: 1000 MW1 application · Grant 3-9 monthsfor verified buyers

Specifications

Capacity applied10 MW to 1000 MW (see variants)
ApplicationConnectivitymade to order: GNA / Both
ScopeDocument preparation and filing
Bank guaranteeArranged by client
StudiesGrid impact summarymade to order: Detailed power system study
Portal handlingSTU portalmade to order: CTUIL portal
TeamRegulatory lead and engineermade to order: Dedicated manager
TimelineApproval 3-6 months
Technical documentsSwitchyard layout and GA drawings
QueriesUntil grantmade to order: Responded within 2 days
Fee basisFixedmade to order: Fixed plus success

BARREL: Bharat Atom Renewable Resources Energy Limited