Catalogue / Grid connectivity & GNA applications
Evacuation approval for solar and wind parks, Edge seriesSample
by Wayanad Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Wayanad Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Edge service of evacuation approval for solar and wind parks by Wayanad covers 6 capacity applied options (10 MW to 1000 MW). Design: eligibility check before filing, preparation of mandatory technical details and bank guarantee timeline tracking. Suited to renewable developers, storage developers and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Wayanad
- Model
- WAY-F34 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWWAY-F34-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied50 MWWAY-F34-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWWAY-F34-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWWAY-F34-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWWAY-F34-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWWAY-F34-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | Connectivitymade to order: GNA / Both |
| Scope | Document preparation and filing |
| Bank guarantee | Arranged by client |
| Studies | Grid impact summarymade to order: Detailed power system study |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Approval 3-6 months |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixedmade to order: Fixed plus success |