Traction power control software, Core seriesSample
by Wayanadjoule Traction Power (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Wayanadjoule Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Wayanadjoule Core traction power control software, offered in 5 control posts options from Up to 10 posts to Up to 250 posts. Design: remote operation of interrupters and isolators, impedance fault locator and energy and tariff reports. Typically used for metro traction control, industrial rail and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Wayanadjoule
- Model
- WAY-D79 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 2 lot
- Lead time
- 20-28 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsWAY-D79-01 | Control posts: Up to 10 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 25 postsWAY-D79-02 | Control posts: Up to 25 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 50 postsWAY-D79-03 | Control posts: Up to 50 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 100 postsWAY-D79-04 | Control posts: Up to 100 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 250 postsWAY-D79-05 | Control posts: Up to 250 posts | 2 lot · 20-28 weeks | on quote |
Specifications
| Control posts | Up to 10 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Distributed |
| RTU I/O | Per post |
| Communication | GSM backupmade to order: OFC / MPLS |
| Protocol | IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |