Catalogue / Traction SCADA

No photo yet

Traction power control software, Core seriesSample

by Wayanadjoule Traction Power (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Wayanadjoule Traction Power (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Wayanadjoule Core traction power control software, offered in 5 control posts options from Up to 10 posts to Up to 250 posts. Design: remote operation of interrupters and isolators, impedance fault locator and energy and tariff reports. Typically used for metro traction control, industrial rail and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Wayanadjoule
Model
WAY-D79 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
20-28 weeks
Warranty
24 months
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
South India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsWAY-D79-01Control posts: Up to 10 posts2 lot · 20-28 weekson quote
Control postsUp to 25 postsWAY-D79-02Control posts: Up to 25 posts2 lot · 20-28 weekson quote
Control postsUp to 50 postsWAY-D79-03Control posts: Up to 50 posts2 lot · 20-28 weekson quote
Control postsUp to 100 postsWAY-D79-04Control posts: Up to 100 posts2 lot · 20-28 weekson quote
Control postsUp to 250 postsWAY-D79-05Control posts: Up to 250 posts2 lot · 20-28 weekson quote

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureDistributed
RTU I/OPer post
CommunicationGSM backupmade to order: OFC / MPLS
ProtocolIEC 61850
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited