Traction SCADA system, Max seriesSample
by Wayanadjoule Traction Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Wayanadjoule Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Max range of traction SCADA system by Wayanadjoule covers 5 control posts options (Up to 10 posts to Up to 250 posts). Key features: impedance fault locator, sequence of events recording and failover in under 3 seconds. Suited to metro traction control, mining railways and railway zones. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Wayanadjoule
- Model
- WAY-6A6 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 12-16 weeks
- Warranty
- 36 months with AMC
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsWAY-6A6-01 | Control posts: Up to 10 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 25 postsWAY-6A6-02 | Control posts: Up to 25 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 50 postsWAY-6A6-03 | Control posts: Up to 50 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 100 postsWAY-6A6-04 | Control posts: Up to 100 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 250 postsWAY-6A6-05 | Control posts: Up to 250 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 10 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Distributedmade to order: Redundant server |
| RTU I/O | Per post |
| Communication | OFC / MPLS |
| Protocol | IEC 60870-5-104 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |