SCADA for 25 kV AC electrification, Neo 7 seriesSample
by Wayanadjoule Traction Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Wayanadjoule Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo 7 range of SCADA for 25 kV AC electrification by Wayanadjoule covers 3 control posts options (Up to 50 posts to Up to 250 posts). Key features: impedance fault locator, sequence of events recording and energy and tariff reports. Suited to industrial rail, railway zones and metro traction control. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Wayanadjoule
- Model
- WAY-C56 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 20-28 weeks
- Warranty
- 36 months with AMC
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 50 postsWAY-C56-01 | Control posts: Up to 50 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 100 postsWAY-C56-02 | Control posts: Up to 100 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 250 postsWAY-C56-03 | Control posts: Up to 250 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 50 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Redundant servermade to order: Distributed |
| RTU I/O | Per post |
| Communication | OFC / MPLS |
| Protocol | IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |