Catalogue / OHE masts, cantilevers & catenary
Steel structure for OHE, Duo seriesSample
by Wayanadjoule Traction Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Wayanadjoule Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Steel structure for OHE from Wayanadjoule, Duo series: 3 mast type options between Portal 4-track and Booster mast. Design: fit-up tested before dispatch, quality inspected by RDSO nominated agencies and matching cantilever sets. Suited to port railways, industrial railway sidings and railway electrification. Designed and tested to RDSO TI/SPC/OHE, IS 800 and IS 2062. Lead time 4-6 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Wayanadjoule
- Model
- WAY-1C8 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 4-6 weeks
- Warranty
- As per contract
- Standards
- RDSO TI/SPC/OHE, IS 800, IS 2062
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Mast typePortal 4-trackWAY-1C8-01 | Mast type: Portal 4-track | 2 nos · 4-6 weeks | for verified buyers |
| Mast typeTunnel bracketWAY-1C8-02 | Mast type: Tunnel bracket | 2 nos · 4-6 weeks | for verified buyers |
| Mast typeBooster mastWAY-1C8-03 | Mast type: Booster mast | 2 nos · 4-6 weeks | for verified buyers |
Specifications
| Mast type | Portal 4-track to Booster mast (see variants) |
|---|---|
| Section | Fabricated lattice |
| Height | 9.5 m |
| Steel grade | Fe 490made to order: Fe 410 |
| Galvanising | Hot-dip 610 g/m2 |
| Mast bending moment | Per RDSO |
| Foundation | Concrete block |
| Cantilever | Tubular, galvanised |
| Registration arm | Included |
| Insulator | Polymer or porcelain |
| Setting distance | 2.8 m |
| Fittings | Hot-dip galvanised |
| Welding | Certified welders |