Catalogue / Site acceptance & pre-commissioning tests
Pre-commissioning tests for substations, Ultra seriesSample
by Airavatsys Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Airavatsys Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra service of pre-commissioning tests for substations by Airavatsys covers 6 plant size options (1 MW to 100 MW). Highlights: support to CEIG inspection, final dossier for handover and checklist driven testing. Typically used for EPC handover, lender completion and renewable parks. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Airavatsys
- Model
- AIR-1A4 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- On-site 3-21 days
- Warranty
- Report accuracy guaranteed
- Standards
- IEC 62446-1, IS 3043, IEC 61557
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant size1 MWAIR-1A4-01 | Plant size: 1 MW | 1 site · On-site 3-21 days | on quote |
| Plant size5 MWAIR-1A4-02 | Plant size: 5 MW | 1 site · On-site 3-21 days | on quote |
| Plant size10 MWAIR-1A4-03 | Plant size: 10 MW | 1 site · On-site 3-21 days | on quote |
| Plant size25 MWAIR-1A4-04 | Plant size: 25 MW | 1 site · On-site 3-21 days | on quote |
| Plant size50 MWAIR-1A4-05 | Plant size: 50 MW | 1 site · On-site 3-21 days | on quote |
| Plant size100 MWAIR-1A4-06 | Plant size: 100 MW | 1 site · On-site 3-21 days | on quote |
Specifications
| Plant size | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Solar SAT |
| Instruments | Insulation tester, earth tester |
| Test sequence | Visual, mechanical, electricalmade to order: Per client approved format |
| Team | Team of 6 with lead |
| Duration on site | 10 daysmade to order: 3-5 days / 3 weeks |
| Reports | Test results on approved formatsmade to order: Digital dossier with photos |
| Calibration | NABL traceable |
| Witnessed by | Client engineermade to order: Lender engineer or authority |
| Retest policy | One retest includedmade to order: Charged |
| Payment | On completion of reportmade to order: 50% advance |