Merchants / AIRAVATSYSENGINEER

Airavatsys Engineering Services (Sample)

Airavatsys Engineering Services LLP (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 10 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Type & routine testing laboratories (NABL)

Environmental and ingress protection testing, Neo 7 series

SampleServiceType & routine testing laboratories (NABL)

Airavatsys · AIR-9B6 series

Test class
Acceptance test to Short-circuit test (see variants)
Equipment under test
Switchgear
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 33 kV
Test standard
Customer specific test plan

Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Factory acceptance test (FAT) witnessing

SCADA and RTU factory test, Xtra series

SampleServiceFactory acceptance test (FAT) witnessing

Airavatsys · AIR-DF1 series

Equipment value
INR 25 lakh to INR 25 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

SCADA and RTU factory test, Flex series

SampleServiceFactory acceptance test (FAT) witnessing

Airavatsys · AIR-DF3 series

Equipment value
INR 1 crore to INR 10 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price on quote

invoiced by BARREL

Request quote

Site acceptance & pre-commissioning tests

Pre-commissioning tests for substations, Edge series

SampleServiceSite acceptance & pre-commissioning tests

Airavatsys · AIR-1A6 series

Plant size
1 MW to 25 MW (see variants)
Scope
Electrical pre-commissioning
Instruments
Relay test set, IV tracer, CRM
Test sequence
Visual, mechanical, electrical
Team
Test engineer plus 2 technicians

Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Pre-commissioning tests for substations, Ultra series

SampleServiceSite acceptance & pre-commissioning tests

Airavatsys · AIR-1A4 series

Plant size
1 MW to 100 MW (see variants)
Scope
Solar SAT
Instruments
Insulation tester, earth tester
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price on quote

invoiced by BARREL

Request quote

Electrical safety audits

Fire and arc-flash risk assessment, Plus series

SampleServiceElectrical safety audits

Airavatsys · AIR-2D9 series

Installed load
1 MVA to 25 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
Chartered engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Fire and arc-flash risk assessment, Plus 7 series

SampleServiceElectrical safety audits

Airavatsys · AIR-2D3 series

Installed load
500 kVA to 5 MVA (see variants)
Scope
Visual and documentation audit
Auditor
CEA-licensed engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Third-party inspection (TPI)

Airavatsys · AIR-091 series

Inspection effort
5 man-days to 100 man-days (see variants)
Equipment inspected
Transformers and reactors
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

Airavatsys · AIR-091 series

Inspection effort
10 man-days to 100 man-days (see variants)
Equipment inspected
Switchgear and relays
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

Product certification (BIS, IEC, ALMM)

ALMM enlistment for solar modules, Eco series

SampleServiceProduct certification (BIS, IEC, ALMM)

Airavatsys · AIR-465 series

Certification scope
ALMM List-I to Full global set (see variants)
Standards covered
IEC 62109 for inverters
Application support
Documentation and filing
Test lab liaison
Notified bodies
Factory audit
Pre-audit gap analysis

Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited