Catalogue / Third-party inspection (TPI)
Pre-dispatch inspection of transformers and switchgear, Plus seriesSample
by Airavatsys Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Airavatsys Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus service of pre-dispatch inspection of transformers and switchgear by Airavatsys covers 5 inspection effort options (5 man-days to 100 man-days). Design: photographic evidence of each inspection, hold and witness points per QAP and independent opinion for buyers. Used by lender quality assurance, EPC contractors and developers and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Airavatsys
- Model
- AIR-091 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysAIR-091-01 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort10 man-daysAIR-091-02 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort20 man-daysAIR-091-03 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysAIR-091-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort100 man-daysAIR-091-05 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 5 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Transformers and reactorsmade to order: Switchgear and relays / PV modules and inverters / Cables and conductors |
| Inspection stage | In-processmade to order: Raw material / Final pre-dispatch |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | B.E. Electrical with 8 years experience |
| Accreditation | Empanelled inspection agencymade to order: ISO/IEC 17020 body |
| Report | Inspection release note |
| Coverage | Pan Indiamade to order: Domestic and export vendors |
| Sampling | As per IS 2500 |
| Release note | Hard copy plus scanmade to order: Digital signature |
| Travel | Included in rate |