Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Pre-commissioning tests for substations, Edge seriesSample

by Airavatsys Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Airavatsys Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Pre-commissioning tests for substations from Airavatsys, Edge series: 4 plant size options between 1 MW and 25 MW. Design: thermography prior to energisation, instrument calibration certificates and defect register shared daily. Used by EPC handover, renewable parks and lender completion. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation Mobilisation in 3-7 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Airavatsys
Model
AIR-1A6 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Mobilisation in 3-7 days
Warranty
Retest at no cost on instrument error
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size1 MWAIR-1A6-01Plant size: 1 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size5 MWAIR-1A6-02Plant size: 5 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size10 MWAIR-1A6-03Plant size: 10 MW1 site · On-site 3-21 daysfor verified buyers
Plant size25 MWAIR-1A6-04Plant size: 25 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size1 MW to 25 MW (see variants)
ScopeElectrical pre-commissioningmade to order: Solar SAT / Complete SAT with performance test
InstrumentsRelay test set, IV tracer, CRMmade to order: Insulation tester, earth tester
Test sequenceVisual, mechanical, electricalmade to order: Per client approved format
TeamTest engineer plus 2 techniciansmade to order: Team of 6 with lead
Duration on site10 daysmade to order: 3-5 days / 3 weeks
ReportsTest results on approved formats
CalibrationCalibration certificates attached
Witnessed byClient engineer
Retest policyOne retest includedmade to order: Charged
Payment50% advancemade to order: On completion of report

BARREL: Bharat Atom Renewable Resources Energy Limited