Catalogue / Electrical safety audits
Fire and arc-flash risk assessment, Plus seriesSample
by Airavatsys Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Airavatsys Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus service of fire and arc-flash risk assessment by Airavatsys covers 4 installed load options (1 MVA to 25 MVA). Key features: risk-ranked findings, earthing health and soil resistivity and training recommendations for staff. Suited to manufacturing plants, solar and wind sites and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Airavatsys
- Model
- AIR-2D9 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAAIR-2D9-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load5 MVAAIR-2D9-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load10 MVAAIR-2D9-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load25 MVAAIR-2D9-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 25 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash study |
| Auditor | Chartered engineermade to order: CEA-licensed engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Action plan with timelinemade to order: Findings with risk rating |
| Statutory records | Registers, test certificates, licence |
| Sampling | 100% of HV equipment |
| Follow-up | Close-out verification |
| Turnaround | 3-4 weeks |
| Presentation | Report onlymade to order: Findings to management |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |