Catalogue / Electrical safety audits

No photo yet

Fire and arc-flash risk assessment, Plus 7 seriesSample

by Airavatsys Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Airavatsys Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Fire and arc-flash risk assessment from Airavatsys, Plus 7 series: 3 installed load options between 500 kVA and 5 MVA. Highlights: photographic evidence of non-compliances, fire exit and detection checks and compliance matrix against CEA safety rules. Used by manufacturing plants, hospitals and commercial buildings and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Airavatsys
Model
AIR-2D3 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Re-audit at reduced rate
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load500 kVAAIR-2D3-01Installed load: 500 kVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load1 MVAAIR-2D3-02Installed load: 1 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load5 MVAAIR-2D3-03Installed load: 5 MVA1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Installed load500 kVA to 5 MVA (see variants)
ScopeVisual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study
AuditorCEA-licensed engineermade to order: Chartered engineer
MeasurementsEarth resistance, insulationmade to order: Thermography and power quality
ReportAction plan with timeline
Statutory recordsPermit-to-work auditmade to order: Registers, test certificates, licence
SamplingRepresentative LV panels
Follow-upRe-audit after 3 months
Turnaround3-4 weeksmade to order: 1-2 weeks
PresentationReport only
AccreditationGovernment recognised agencymade to order: ISO/IEC 17020 body

BARREL: Bharat Atom Renewable Resources Energy Limited