Catalogue / Electrical safety audits
Fire and arc-flash risk assessment, Plus 7 seriesSample
by Airavatsys Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Airavatsys Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Fire and arc-flash risk assessment from Airavatsys, Plus 7 series: 3 installed load options between 500 kVA and 5 MVA. Highlights: photographic evidence of non-compliances, fire exit and detection checks and compliance matrix against CEA safety rules. Used by manufacturing plants, hospitals and commercial buildings and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Airavatsys
- Model
- AIR-2D3 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load500 kVAAIR-2D3-01 | Installed load: 500 kVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load1 MVAAIR-2D3-02 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load5 MVAAIR-2D3-03 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
Specifications
| Installed load | 500 kVA to 5 MVA (see variants) |
|---|---|
| Scope | Visual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Action plan with timeline |
| Statutory records | Permit-to-work auditmade to order: Registers, test certificates, licence |
| Sampling | Representative LV panels |
| Follow-up | Re-audit after 3 months |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Report only |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |