Catalogue / Waste-heat recovery units
Waste-heat to power steam turbine set, Xtra 2 seriesSample
by Awadh Gas Turbines (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Awadh Gas Turbines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Xtra 2 range of waste-heat to power steam turbine set by Awadh covers 4 recovered heat options (1 MWth to 10 MWth). Design: corrosion protection for low-temperature end, IBR approved design and low pressure drop on engine exhaust. Used by gas engine plants, CHP plants and process heat users. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Awadh
- Model
- AWA-B11 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 10-14 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat1 MWthAWA-B11-01 | Recovered heat: 1 MWth | 5 nos · 10-14 weeks | on quote |
| Recovered heat3 MWthAWA-B11-02 | Recovered heat: 3 MWth | 5 nos · 10-14 weeks | on quote |
| Recovered heat5 MWthAWA-B11-03 | Recovered heat: 5 MWth | 5 nos · 18-26 weeks | on quote |
| Recovered heat10 MWthAWA-B11-04 | Recovered heat: 10 MWth | 5 nos · 18-26 weeks | on quote |
Specifications
| Recovered heat | 1 MWth to 10 MWth (see variants) |
|---|---|
| Heat source | Kiln gasmade to order: Gas engine exhaust / Gas turbine exhaust |
| Gas inlet temperature | 550 C |
| Medium | Organic fluidmade to order: Steam / Hot water / Thermal oil |
| Steam pressure | 40 barmade to order: 8 bar / 17 bar |
| Power output (ORC) | 500 kWmade to order: 100 kW / 2 MW |
| Construction | Fin tube |
| Material | Corten |
| Bypass damper | Diverter included |
| Design code | ASME |
| Gas pressure drop | < 250 mmWC |