Catalogue / Waste-heat recovery units
Waste-heat to power steam turbine set, Duo 2 seriesSample
by Bundel Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Bundel Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Duo 2 range of waste-heat to power steam turbine set by Bundel covers 4 recovered heat options (0.5 MWth to 5 MWth). Design: IBR approved design, corrosion protection for low-temperature end and increase total plant efficiency to 80 percent plus. Typically used for CHP plants, process heat users and cement and steel waste heat. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Bundel
- Model
- BUN-B19 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 18-26 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthBUN-B19-01 | Recovered heat: 0.5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat1 MWthBUN-B19-02 | Recovered heat: 1 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat3 MWthBUN-B19-03 | Recovered heat: 3 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthBUN-B19-04 | Recovered heat: 5 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 5 MWth (see variants) |
|---|---|
| Heat source | Kiln gas |
| Gas inlet temperature | 400 C |
| Medium | Hot watermade to order: Steam / Thermal oil / Organic fluid |
| Steam pressure | 17 barmade to order: 8 bar / 40 bar |
| Power output (ORC) | 100 kW |
| Construction | Shell and tube |
| Material | Carbon steel |
| Bypass damper | Diverter included |
| Design code | IBR |
| Gas pressure drop | < 250 mmWC |