Catalogue / Waste-heat recovery units

No photo yet

Organic Rankine cycle unit, Max 6 seriesSample

by Bundel Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Bundel Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Bundel Max 6 organic Rankine cycle unit, offered in 5 recovered heat options from 0.5 MWth to 10 MWth. Key features: increase total plant efficiency to 80 percent plus, corrosion protection for low-temperature end and IBR approved design. Used by CHP plants, cement and steel waste heat and gas engine plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Bundel
Model
BUN-673 series
Listing type
Product
Unit
nos
Minimum order
10 nos
Lead time
10-14 weeks
Warranty
12 months
Standards
IBR 1950, ASME Sec VIII, IS 2825
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Recovered heat0.5 MWthBUN-673-01Recovered heat: 0.5 MWth10 nos · 10-14 weeksfor verified buyers
Recovered heat1 MWthBUN-673-02Recovered heat: 1 MWth10 nos · 10-14 weeksfor verified buyers
Recovered heat3 MWthBUN-673-03Recovered heat: 3 MWth10 nos · 10-14 weeksfor verified buyers
Recovered heat5 MWthBUN-673-04Recovered heat: 5 MWth10 nos · 18-26 weeksfor verified buyers
Recovered heat10 MWthBUN-673-05Recovered heat: 10 MWth10 nos · 18-26 weeksfor verified buyers

Specifications

Recovered heat0.5 MWth to 10 MWth (see variants)
Heat sourceKiln gasmade to order: Gas engine exhaust / Gas turbine exhaust
Gas inlet temperature400 C
MediumThermal oilmade to order: Steam / Hot water / Organic fluid
Steam pressure8 barmade to order: 17 bar / 40 bar
Power output (ORC)2 MW
ConstructionFin tubemade to order: Bare tube / Shell and tube
MaterialSS 304made to order: Carbon steel / Corten
Bypass damperDiverter included
Design codeIBR
Gas pressure drop< 250 mmWC

BARREL: Bharat Atom Renewable Resources Energy Limited