Catalogue / Flue-gas desulphurisation (FGD)
Seawater FGD, Pro 5 seriesSample
by Coorg Enviro Engineers (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Coorg Enviro Engineers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Pro 5 range of seawater FGD by Coorg covers 6 boiler size options (25 MW to 500 MW). Highlights: corrosion resistant internals, mist eliminators for droplet control and online SO2 analyser interface. Used by coal fired thermal plants, industrial boilers and captive power plants. Designed and tested to MoEF&CC notification 2015, IS 11255 and CPCB norms. Lead time 24-36 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Coorg
- Model
- COO-405 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 1 set
- Lead time
- 24-36 weeks
- Warranty
- 12 months from commissioning
- Standards
- MoEF&CC notification 2015, IS 11255, CPCB norms
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Boiler size25 MWCOO-405-01 | Boiler size: 25 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size60 MWCOO-405-02 | Boiler size: 60 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size120 MWCOO-405-03 | Boiler size: 120 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size210 MWCOO-405-04 | Boiler size: 210 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size350 MWCOO-405-05 | Boiler size: 350 MW | 1 set · 40-60 weeks | for verified buyers |
| Boiler size500 MWCOO-405-06 | Boiler size: 500 MW | 1 set · 40-60 weeks | for verified buyers |
Specifications
| Boiler size | 25 MW to 500 MW (see variants) |
|---|---|
| Technology | Semi-dry |
| SO2 removal efficiency | 80% |
| Inlet SO2 | Up to 1500 mg/Nm3made to order: Up to 2500 mg/Nm3 |
| Absorber material | Rubber lined carbon steel |
| Reagent | Limestone |
| Gypsum quality | Saleable grademade to order: Disposal grade |
| Water consumption | Standardmade to order: Low |
| Control | Standalone PLCmade to order: DCS integrated |
| Chimney | Wet stack liner |