Merchants / COORGENVIROENGINEE

Coorg Enviro Engineers (Sample)

Coorg Enviro Engineers Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 18 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

ESP & bag filters

Pulse-jet bag filter, Duo series

SampleESP & bag filters

Coorg · COO-451 series

Gas flow rate
10000 Am3/h to 250000 Am3/h (see variants)
Outlet emission
Below 50 mg/Nm3
Inlet temperature
Up to 180 deg C
Filter media
PPS felt
Cleaning
Reverse air

Lead time 20-28 weeks · Warranty 24 months on mechanical parts · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

Coorg · COO-2A4 series

Gas flow rate
10000 Am3/h to 250000 Am3/h (see variants)
Outlet emission
Below 50 mg/Nm3
Inlet temperature
Up to 180 deg C
Filter media
PPS felt
Cleaning
Reverse air

Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

Hybrid ESP-bag filter, Plus series

SampleESP & bag filters

Coorg · COO-F02 series

Gas flow rate
25000 Am3/h to 1000000 Am3/h (see variants)
Outlet emission
Below 30 mg/Nm3
Inlet temperature
Up to 250 deg C
Filter media
PPS felt
Cleaning
Reverse air

Lead time 20-28 weeks · Warranty 12 months from commissioning · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

SCR / SNCR NOx control

SNCR urea injection system, Max 2 series

SampleSCR / SNCR NOx control

Coorg · COO-326 series

Flue gas flow
100000 Nm3/h to 1000000 Nm3/h (see variants)
Technology
SCR
NOx removal efficiency
70%
Reagent
Ammonia 25%
Catalyst
Honeycomb V2O5-WO3/TiO2

Lead time 30-44 weeks · Warranty 12 months from commissioning · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

Urea dosing and storage unit, Elite series

SampleSCR / SNCR NOx control

Coorg · COO-9A1 series

Flue gas flow
100000 Nm3/h to 500000 Nm3/h (see variants)
Technology
Hybrid
NOx removal efficiency
85%
Reagent
Urea solution 40%
Catalyst
Honeycomb V2O5-WO3/TiO2

Lead time 30-44 weeks · Warranty 12 months from commissioning · MOQ 2 set

Price for verified buyers

invoiced by BARREL

Request quote

Ammonia flow control skid, Core series

SampleSCR / SNCR NOx control

Coorg · COO-A34 series

Flue gas flow
50000 Nm3/h to 1000000 Nm3/h (see variants)
Technology
SCR
NOx removal efficiency
85%
Reagent
Ammonia 25%
Catalyst
Honeycomb V2O5-WO3/TiO2

Lead time 16-24 weeks · Warranty 24000 operating hours on catalyst · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

Ash utilisation

Coorg · COO-568 series

Fly ash fineness (Blaine)
300 sq m/kg to 400 sq m/kg (see variants)
Source
ESP hopper
Grade
Siliceous Grade 2
Loss on ignition
Below 5%
Moisture
Below 5%

Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 10 MT

Price for verified buyers

invoiced by BARREL

Request quote

Coorg · COO-5C3 series

Fly ash fineness (Blaine)
250 sq m/kg to 400 sq m/kg (see variants)
Source
Pond ash
Grade
Siliceous Grade 2
Loss on ignition
Below 2%
Moisture
Below 1%

Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 10 MT

Price for verified buyers

invoiced by BARREL

Request quote

Fly ash bricks, Ultra series

SampleAsh utilisation

Coorg · COO-399 series

Fly ash fineness (Blaine)
250 sq m/kg to 320 sq m/kg (see variants)
Source
Bottom ash
Grade
Siliceous Grade 1
Loss on ignition
Below 5%
Moisture
Below 5%

Lead time 3-7 days · Warranty Test certificate per lot · MOQ 5 MT

Price for verified buyers

invoiced by BARREL

Request quote

Flue-gas desulphurisation (FGD)

Wet limestone FGD system, Plus 8 series

SampleFlue-gas desulphurisation (FGD)

Coorg · COO-772 series

Boiler size
10 MW to 210 MW (see variants)
Technology
Semi-dry
SO2 removal efficiency
95%
Inlet SO2
Up to 1500 mg/Nm3
Absorber material
Alloy lined

Lead time 24-36 weeks · Warranty 12 months from commissioning · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

Gypsum dewatering system, Elite series

SampleFlue-gas desulphurisation (FGD)

Coorg · COO-235 series

Boiler size
10 MW to 350 MW (see variants)
Technology
Dry sorbent
SO2 removal efficiency
90%
Inlet SO2
Up to 1500 mg/Nm3
Absorber material
Rubber lined carbon steel

Lead time 24-36 weeks · Warranty 24 months performance guarantee · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

Seawater FGD, Pro 5 series

SampleFlue-gas desulphurisation (FGD)

Coorg · COO-405 series

Boiler size
25 MW to 500 MW (see variants)
Technology
Semi-dry
SO2 removal efficiency
80%
Inlet SO2
Up to 1500 mg/Nm3
Absorber material
Rubber lined carbon steel

Lead time 24-36 weeks · Warranty 12 months from commissioning · MOQ 1 set

Price for verified buyers

invoiced by BARREL

Request quote

CEMS & ambient air monitoring

Continuous emission monitoring system, Xtra series

SampleCEMS & ambient air monitoring

Coorg · COO-8B5 series

Parameters monitored
PM + SO2 + NOx to Full CEMS 8 parameters (see variants)
Measurement method
Dilution extractive
Particulate sensor
Opacity
Gas analyser
Chemiluminescence
Data logging
Modbus TCP

Lead time 6-8 weeks · Warranty 24 months on analysers · MOQ 1 set

Price on quote

invoiced by BARREL

Request quote

PM2.5 and PM10 analyser, Xtra 9 series

SampleCEMS & ambient air monitoring

Coorg · COO-909 series

Parameters monitored
PM only to Full CEMS 8 parameters (see variants)
Measurement method
Extractive hot-wet
Particulate sensor
Beta attenuation
Gas analyser
Chemiluminescence
Data logging
4-20 mA

Lead time 10-14 weeks · Warranty 24 months on analysers · MOQ 1 set

Price on quote

invoiced by BARREL

Request quote

Stack opacity monitor, Volt series

SampleCEMS & ambient air monitoring

Coorg · COO-CF3 series

Parameters monitored
PM only to PM + gases + flow (see variants)
Measurement method
In-situ
Particulate sensor
Opacity
Gas analyser
Chemiluminescence
Data logging
4-20 mA

Lead time 10-14 weeks · Warranty 12 months from commissioning · MOQ 2 set

Price on quote

invoiced by BARREL

Request quote

Noise control

Coorg · COO-D01 series

Insertion loss
20 dB to 40 dB (see variants)
Equipment served
Compressor
Panel construction
GI perforated with rockwool
Infill
Rockwool 100 mm
Sheet thickness
1.6 mm

Lead time 3-4 weeks · Warranty 24 months against corrosion · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Coorg · COO-007 series

Insertion loss
20 dB to 30 dB (see variants)
Equipment served
Transformer
Panel construction
GI perforated with rockwool
Infill
Rockwool 100 mm
Sheet thickness
1.6 mm

Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Coorg · COO-CA9 series

Insertion loss
15 dB to 25 dB (see variants)
Equipment served
DG set
Panel construction
Double skin MS
Infill
Rockwool 100 mm
Sheet thickness
2.0 mm

Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited